I'm not sure what to make of the set yet. I like the planes (although that biplane really doesn't need the bubble canopy). The idea of adding a hangar is interesting and I don't mind that it's a bit open. But the fact that it'll only house one of the three planes is annoying. Having said that, I'm not sure what you could do about it. Tripling the hangar would make it big and boring and push the price up. Could they have done two planes and a double hangar?
This set is designed for children aged 6+, and one of the ways that it is suitable for them is the inclusion of separate instruction booklets and numbered bags for the different parts of the set (see my post about LEGO age range suitability here).  A younger modeller can build the plane or other item of their choice as soon as they open the box. It's not so much one big set as 5 different parts which make a whole scene. My 7 year old son chose to build a jet first of all...
It’s been three years since the release of the most recent City Airport set, namely, 60019 Stunt Plane, and a full six years since LEGO gave us a number of Airport releases at any one time. Of the five summer 2016 Airport releases, 60103 Airport Air Show was one of those that I was most interested to get my hands on, and I’m pleased to be able to bring you a review of it today.
The set contains six minifigures. Even though they all incorporate standard, unprinted minifigure legs together with commonly-available headprints, it appears that all six are unique to the set. First up are two members of the Ground Crew (below). The bearded guy has an orange torso printed with a hi-viz jacket, ID badge and red pen pattern. This has appeared in nine sets to date including all of the 2016 Airport sets plus 60080 Spaceport which I reviewed here last summer. His red construction helmet, which incorporates a pair of non-removable black ear muffs, has appeared in less than ten sets to date. The other member of the ground crew has a rather nice printed medium blue torso which is new this year and has only appeared in a total of three sets including this one. It features a shirt print which includes the Octan logo and a top pocket complete with a pen.
Parking capacity at Copenhagen Airport was greatly expanded in 2015 with the construction of a new lot as one of the first phases in an ambitious airport expansion plan scheduled to roll out in the coming decades. There are several lots: those near the terminals are very expensive, while the further-flung ones are cheaper (but have free shuttle bus service to the terminals).
×