In 2008, the entire runway was renovated and paved, and a new taxiway was built, nicknamed "Mike". This major task only took 14 hours. The runway was closed over night between the hours 23:00 and 06:00. This did not prevent a Boeing 737-800 from Ryanair landing at one end of the runway, while they worked at the other end. The same year was also a record year for the airport. 2,546,856 passengers passed through the terminals, an increase of 12.7 percent compared with 2007.
In 2008, the entire runway was renovated and paved, and a new taxiway was built, nicknamed "Mike". This major task only took 14 hours. The runway was closed over night between the hours 23:00 and 06:00. This did not prevent a Boeing 737-800 from Ryanair landing at one end of the runway, while they worked at the other end. The same year was also a record year for the airport. 2,546,856 passengers passed through the terminals, an increase of 12.7 percent compared with 2007.
The box set weighs a little over 2kg and has about 694 pieces in total, including 6 minifigures: a pilot, 3 airport workers, a male and a female passenger. The whole build would get you almost an entire airport facade with a pretty big passenger plane, an airport/control tower build, and an airport service car that tows with it a luggage, fuel and and mobile stairway.
So that's it... It's the first passenger airport set released in 6 years.  It comes with a jet, 6 minifigures, a terminal, and some equipment for servicing the aircraft.  Should you get it?  After getting it, I'm glad I got it on sale, but I'm still not sure it was worth what I paid.  I think it needs at least another terminal worker and then a pilot and flight attendant.  Also you're paying for a lot of BURPs to help smooth the aircraft out. The age range listed is 6-12 years old so clearly it is not meant for old farts like me looking for a good building experience.  However, if you're a LEGO CITY fan and you build your own MOCs to go with your city, it has some good additions.  If you're looking to build an airport terminal of your own, you'll find some useful parts to make it realistic.  We'll see if it takes another 6 years for an upgrade.
The remainder of the build is the control tower and terminal building. First there is a metal detector screener leading to the waiting/secure area of the airport, which seems taller than it needs to be for the minifigures. I think the same effect could have been made with half the height, except that would not allow for an impressive height for the overall tower. However it does seem to be similar to many modern airports with the high ceilings. This area also seems to be someplace to check luggage as evidenced by the rather nifty conveyor belt that comes in a full part. The moving parts of the set include a revolving door (a very tall one, for the first floor) that leads from the secure area of the airport out to the tarmac, and of course the conveyor belt.
×