The last of the three aircraft is a modern biplane. This incorporates a number of rare orange elements including right and left 8 x 3 wedge plates which make up the wings and have only previously appeared in three sets, a 3 x 4 wedge brick only previously found in two sets, and a 3 x 6 round half plate with a 1 x 2 cutout which has only previous appeared in a single set in this colour and which forms the tailplanes. Similar to the two jets the tail fin is stickered rather than printed, as are the pair of 1 x 4 x 1 panels making up the sides of the cockpit. Unlike the jets, however, the instrument panel is stickered, which seems odd as there are existing printed 1 x 2 light bluish grey tiles which could have done an acceptable job. There are also a pair of stickers which represent the engine exhausts and which are applied to a couple of modified 2 x 4 x 1 1/3 bricks with curved top which sit just behind the propeller; applying these neatly to the curved surface takes a steady hand, and that’s also the case for the pair of checkerboard stickers which are stuck onto the propeller cowl. As if stickered exhausts weren’t enough, there are also a couple of light bluish grey exhaust pipes with Technic pin which emerge from the propeller cowl and run along either side of the fuselage. They’re entirely superfluous given the presence of the stickered exhausts but they still look cool regardless!
Parking capacity at Copenhagen Airport was greatly expanded in 2015 with the construction of a new lot as one of the first phases in an ambitious airport expansion plan scheduled to roll out in the coming decades. There are several lots: those near the terminals are very expensive, while the further-flung ones are cheaper (but have free shuttle bus service to the terminals).
Lego operates 132 so-called "Lego Store" retail shops.[71] There are stores at the Downtown Disney shopping complexes at Disneyland and Walt Disney World Resorts as well as in Mall of America in Bloomington, Minnesota. The opening of each store is celebrated with weekend-long event in which a Master Model Builder creates, with the help of volunteers—most of whom are children—a larger-than-life Lego statue, which is then displayed at the new store for several weeks.[72]
I'm not sure what to make of the set yet. I like the planes (although that biplane really doesn't need the bubble canopy). The idea of adding a hangar is interesting and I don't mind that it's a bit open. But the fact that it'll only house one of the three planes is annoying. Having said that, I'm not sure what you could do about it. Tripling the hangar would make it big and boring and push the price up. Could they have done two planes and a double hangar?
The main wings are made up of a pair of white 10 x 10 wedge plates with cut corner and no studs in the centre; these are rare, having only previously appeared in two sets in this colour. The red 1 x 1 plate with tooth on each wing tip is also uncommon, having appeared in less than ten sets to date. The sides of the cockpit are made up of stickered red 1 x 4 x 1 panels, and it definitely helps if you concentrate when you apply the stickers, which I clearly didn’t as you can see in the picture below…. The area behind the cockpit canopy is nicely contoured by a red 4 x 4 triple wedge which, I was surprised to discover, has only previously appeared in a single set in this colour. Not to be outdone, however, the large 12 x 2 x 5 tail is appearing for the very first time in red. The hinged trans-black cockpit canopy is yet another rare element, appearing here for only the second time ever; rare it might be, but its pronounced curvature unfortunately means that it somewhat spoils the hitherto sleek lines of the jet. The flipside of this, however, is that the cockpit can comfortably accommodate the pilot.

Correct - the hanger can only accommodate the biplane. That having been said, in order to accommodate the other aircraft too the hangar would have to be huge, with an enormous footprint, and a substantially increased parts count. As a result, I'd estimate a price up to double the current RRP which I suspect few of the target market would pay. LEGO therefore got the size of the hanger right IMHO.

Structurally, the plane model is sound and very well-built. A little too well-built in some areas you would say, but they are necessary measures like the awkward humps in the interior of the plane you will discover. Space is very wisely used in this model as they’ve managed to fit a proper looking cockpit for 2 pilots and even managed to squeeze in a sink, a mini-bar with the one drink, seats for 6 more passengers and even a tight little space of a washroom. That door hinge though, is a work of art.
My six year old grandson loves Lego's. His daddy is a pilot so we got him this Lego City Airport for his birthday. Wow! He couldn't wait to put it together! It was organized in bags (which I didn't know) and this prevents overwhelming a little person. At least that's what my son said! He did indeed help our grandson put it together, but that was expected as a father/son project. It is so realistic! I love the tower especially. It has moving parts and all kinds of nifty little things - like luggage! The plane has a bathroom too! This is a great addition to anyone who loves Lego's!
Pack your bags and get ready to go on vacation! Head to the airport and check in at the terminal. Put your luggage on the conveyor belt and watch it get loaded onto the passenger airplane. Go through security and then head out the revolving doors to the loading area. Climb the stairs and get buckled in, your trip is about to start! This creative play building toy includes 6 minifigures.
Anyway, I think this may be my favorite LEGO City air terminal yet! It may not be as big as some previous ones, but it feels really coherent. The plane is nice as well with its white, orange, and blue stripes. I agree that Heartlake City Airport's plane has a cozier and more detailed interior, though. It does really highlight some of the differences between Friends and City, with City opting for capacity over comfort and function over flair.
LDStructure, developed by Michael Heidemann, is a tool for analyzing ldraw parts library. With LDStructure you will get a tool that tells you which parts are required to show the current part and where the current part is used in. You will get this information within a second or even quicker. So this tool is a "needs to have" if you are working on parts for the ldraw part library.
SAS is a member of Star Alliance, meaning that many of their flights are code-shared or can be interlined with local Star Alliance partners. Therefore, you can take advantage of a one-ticket flight to, from, or via Copenhagen even if your origin or destination is not directly served by SAS. Norwegian is not a member of any alliance, but they offer connecting flights from Copenhagen to their European destinations on one ticket with an intercontinental flight.
It’s always tough to sum up a set that has the sort of price tag that this one carries; because it doesn’t necessarily offer the collectors value that a Marvel or Star Wars set will offer, it can be a little harder to justify an outlay on, in this case, a few planes and a aircraft hangar. However, if you have a love for the City range, whether it be a nostalgic look back at your childhood, the general consistently-superior design of the range, or simply because your kids want an airport to build, this one has to be recommended. Once I finished building this, I set it up in my daughter’s bedroom, and the overjoyed expression on her face, followed by the extended time taken to play with the planes and flying them all over her room, made every single minute of the build worthwhile. Watching her swirl around her room – and later, the rest of house – clutching the planes and bringing them in for landings into the hangar, reminded me of why I fell in love with LEGO in the the first place; imagination.

In 1997 they had an architectural competition for a new 430,000 ft² (40,000 m²) passenger terminal, designed to serve 3.5 million passengers a year, north of the original airport. KHR Architects won the assignment and completed the construction in co-operation with COWI, and at the end of May 2002 the new passenger terminal was put to use, as the first phase of the future expansion, which is scheduled to take place north of the start and runway, while air cargo services, business and private aviation will continue to be served from the existing buildings south of the runway. In connection with this expansion, the largest since the beginning of the airport, it was with effect from 1 January 1997 turned into a Joint-stock company, Billund Airport A/S, with the former members Vejle County and municipalities Vejle, Kolding, Grindsted, Billund, and Give as shareholders.
Bag 7 finished off the front facade adds in a metal detector and the baggage check-in station.  I guess you enter from the right and then maybe the revolving doors are where you can walk out to the plane.  I'm not really sure anymore.  The conveyor belt is a nice addition to the set for playability and is set up so you can pull the baggage cart right next to it.  
As is the norm with LEGO sets these days, there are a fair few stickers in use for this item. I’m still not a fan of their use, but at this point in time, it is something I have come to expect and just get on with it now. In their defence, they do add to the overall presentation, making it that little bit harder to complain. As I said, this is my favourite of the three planes in the set, mainly because it looks superb and offers a great build experience. Seriously, I had so much fun building this. The instructions – as always – are clear, and it is not going to provide any major issues. Stability-wise, there are no concerns here, with the finished product very sturdy and, as proved by my daughter, can handle itself when being flown around the room by an excited seven-year-old. One minifigure can be seated at the controls, with suitable space for application and removal. The other pilot has its place on the top of the plane, with a single piece of black fencing to provide support for the death-defying pilot.
This detailed model features a classic red, black and grey colour scheme, large driver's cab with detailed dashboard, wing mirrors, opening tool storage compartment, 4-cylinder engine with moving pistons, twin-axle steering, double rear axle and chunky tires. Activate the boom to position the water cannon and extinguish the flames! This Power Functions upgradable model can be rebuilt to create an awesome Fire Rescue Vehicle!

The airport handles an average of more than two million passengers a year, and millions of pounds of cargo. The airport's main runway can handle airliners as large as the Boeing 747, although most passengers arrive on smaller aeroplanes, such as ATR-42s, Boeing 737s and Boeing 757s. Boeing 747 activity at this airport is almost exclusively limited to cargo flights.
The body of the plane is built with five seats for passengers. The wings are added next with what I think are filler stickers added to the top of the wings. There is a small galley with sink and oven in the front of the plane right behind the cockpit. The cockpit uses only one sticker to show navigation equipment - the other is printed, which is always welcome (though not a new piece). A lavatory is installed in the back, and then the inside is complete. There is an odd choice for the door to the lav - a swinging door. Not much opportunity for privacy!
The first few bags build the small truck with carts that you see on airport runways. The truck has a "follow me" sign that I confess I have not seen at any airport. There is also a fueling tank and a rolling staircase that sits next to the plane to allow for boarding. Both the tank and the staircase are additional carts for the truck, though I am guessing not both at the same time.
Billund Airport had its beginning in 1961 when the son of the founder of the Lego Group, Godtfred Kirk Christiansen, established a private 800-meter long runway and hangar north of his factory in Billund. With Christiansen as a key driver, more of the neighbouring municipalities were included in the group of owners, and it was planned that the airport should be expanded to a regular public airport. 
×