Lego also initiated a robotics line of toys called 'Mindstorms' in 1999, and has continued to expand and update this range ever since. The roots of the product originate from a programmable brick developed at the MIT Media Lab, and the name is taken from a paper by Seymour Papert, a computer scientist and educator who developed the educational theory of constructionism, and whose research was at times funded by the Lego Group.[51]
My personal favourite of the three planes included in this set, the design is superb and really captures the look and feel of the old-fashioned airplane that it is based on. The build isn’t too complex, and it really is a joy to see the final product come together. The plane has a distinct orange colour scheme, with some black and grey thrown in, and the shades work well together.
@DrDave : My thoughts were not that the hangar should be big enough to hold *all* aircraft simultaneously - which would, indeed, make it huge! - but that it should at least be big enough to hold any one of them. Just a few studs wider should cover the wingspan of either jet (judging from the photos). Add a few centimetres to the height - by whatever construction means - and that'll accommodate the oversized tail on the Viggen-styled plane. If/when I pick up this set, that's the mods I'll be making to it.
This is a good set if you want an airport. The set includes a big plain and a terminal. The terminal has a control tower, check-in, luggage handler, fuel tank, ... I expanded my terminal and built it on a 32x32 baseplate and used the 2 grey 16x16 plates for the roof. The backside is not completely closed. Otherwise is the luggage belt is not accessible with my hand. I added 2 extra seats in the plane. Normally you have 6 seats in the plane, but I raised it to 8. I wanted more than 8 but that is almost not possible. The plane is brought with a big brick which includes the middle of the plane and the 2 wings and that one limits the possibilities. The toilet in the plane is still on the backside.
Copenhagen Airport is a compact airport with two terminals for check-in, but with a common post-security departure and transfer area, thus making transfers very smooth. The airport handles in excess of 25 million passengers a year, which puts it in the same league as Zurich and Vienna. It has also consistently topped the charts for Nordic airports, serving as a European and intercontinental hub for all of them due to its location.
Since 1963, Lego pieces have been manufactured from a strong, resilient plastic known as acrylonitrile butadiene styrene (ABS).[12][30] As of September 2008, Lego engineers use the NX CAD/CAM/CAE PLM software suite to model the elements. The software allows the parts to be optimised by way of mould flow and stress analysis. Prototype moulds are sometimes built before the design is committed to mass production. The ABS plastic is heated to 232 °C (450 °F) until it reaches a dough-like consistency. It is then injected into the moulds at pressures between 25 and 150 tonnes, and takes approximately 15 seconds to cool. The moulds are permitted a tolerance of up to twenty micrometres, to ensure the bricks remain connected.[33] Human inspectors check the output of the moulds, to eliminate significant variations in colour or thickness. According to the Lego Group, about eighteen bricks out of every million fail to meet the standard required.[37] Lego factories recycle all but about 1 percent of their plastic waste from the manufacturing process. If the plastic cannot be re-used in Lego bricks, it is processed and sold on to industries that can make use of it.[38][39] Lego has a self-imposed 2030 deadline to find a more eco-friendly alternative to the ABS plastic it currently uses in its bricks.[40]
LEGO CITY has some recurring themes that can get old after a while and obviously are meant for younger LEGO fans.  The Fire and Police themes within CITY quickly come to mind as it seems like they have a new run each year.  The Airport theme is one of those that doesn't quite occur every year.  The last airport set was released in 2010 and was set #3182.  This year (2016) another airport was released.  #60104, Airport Passenger Terminal, was released on 1 August 2016 in the US.  It costs $99.99 in the US and contains 694 pieces or $0.144 per piece.  I picked the set up from Amazon at 20% off or $80 ($0.115 per piece).  Yay sales!  Onto the review...

In 1997 they had an architectural competition for a new 430,000 ft² (40,000 m²) passenger terminal, designed to serve 3.5 million passengers a year, north of the original airport. KHR Architects won the assignment and completed the construction in co-operation with COWI, and at the end of May 2002 the new passenger terminal was put to use, as the first phase of the future expansion, which is scheduled to take place north of the start and runway, while air cargo services, business and private aviation will continue to be served from the existing buildings south of the runway. In connection with this expansion, the largest since the beginning of the airport, it was with effect from 1 January 1997 turned into a Joint-stock company, Billund Airport A/S, with the former members Vejle County and municipalities Vejle, Kolding, Grindsted, Billund, and Give as shareholders.


If you don’t own Black Panther Pursuit or any of the sets that included Captain America, I guess it would a plus getting the both of them in this set but Super Heroes collectors tend to be completionists, so I think that scenario will be particularly rare. I guess you could always sell your spares on the secondary market, but really, who wants to do that?

Since the 1950s, the Lego Group has released thousands of sets with a variety of themes, including space, robots, pirates, trains, Vikings, castle, dinosaurs, undersea exploration, and wild west. Some of the classic themes that continue to the present day include Lego City (a line of sets depicting city life introduced in 1973) and Lego Technic (a line aimed at emulating complex machinery, introduced in 1977).[47]

In 2008, the entire runway was renovated and paved, and a new taxiway was built, nicknamed "Mike". This major task only took 14 hours. The runway was closed over night between the hours 23:00 and 06:00. This did not prevent a Boeing 737-800 from Ryanair landing at one end of the runway, while they worked at the other end. The same year was also a record year for the airport. 2,546,856 passengers passed through the terminals, an increase of 12.7 percent compared with 2007.


Compared to other major European hub airports, like Charles de Gaulle or Heathrow, CPH has a similar number of connections, but is much smaller in both actual size and passenger volumes, and can provide a calmer, more pleasant experience. Its location in the south of Scandinavia makes reaching most European destinations reasonable, and flying to destinations in the Baltic region and in Eastern Europe generally only takes half the time as from major hub airports in Western Europe. 
×