In 1997 they had an architectural competition for a new 430,000 ft² (40,000 m²) passenger terminal, designed to serve 3.5 million passengers a year, north of the original airport. KHR Architects won the assignment and completed the construction in co-operation with COWI, and at the end of May 2002 the new passenger terminal was put to use, as the first phase of the future expansion, which is scheduled to take place north of the start and runway, while air cargo services, business and private aviation will continue to be served from the existing buildings south of the runway. In connection with this expansion, the largest since the beginning of the airport, it was with effect from 1 January 1997 turned into a Joint-stock company, Billund Airport A/S, with the former members Vejle County and municipalities Vejle, Kolding, Grindsted, Billund, and Give as shareholders.
Colour-wise, it is mainly yellow, with only a dash of green and red, and a little more white, there to break it up. The worker has space to stand and drive the vehicle, and has a walkie talkie attached on the side of the car. Around the other side is a coiled-up, what I assume is a, fuel pump. It looks pretty good when coiled up on the side of the car. Stickers come into use again here, this time for the number plates.
×