In contrast to the first jet with its delta wing configuration and forward canard wings, the second jet features a more conventional straight wing configuration with tapered leading and trailing edges. As you might expect, construction of the fuselage of the second jet is in many ways similar to that of the first, although in order to accommodate twin exhausts the rear isn’t tapered, and the air intakes which flank the fuselage are of a different design.

The last of the three aircraft is a modern biplane. This incorporates a number of rare orange elements including right and left 8 x 3 wedge plates which make up the wings and have only previously appeared in three sets, a 3 x 4 wedge brick only previously found in two sets, and a 3 x 6 round half plate with a 1 x 2 cutout which has only previous appeared in a single set in this colour and which forms the tailplanes. Similar to the two jets the tail fin is stickered rather than printed, as are the pair of 1 x 4 x 1 panels making up the sides of the cockpit. Unlike the jets, however, the instrument panel is stickered, which seems odd as there are existing printed 1 x 2 light bluish grey tiles which could have done an acceptable job. There are also a pair of stickers which represent the engine exhausts and which are applied to a couple of modified 2 x 4 x 1 1/3 bricks with curved top which sit just behind the propeller; applying these neatly to the curved surface takes a steady hand, and that’s also the case for the pair of checkerboard stickers which are stuck onto the propeller cowl. As if stickered exhausts weren’t enough, there are also a couple of light bluish grey exhaust pipes with Technic pin which emerge from the propeller cowl and run along either side of the fuselage. They’re entirely superfluous given the presence of the stickered exhausts but they still look cool regardless!
This set has essentially all that's needed for airplane-related play: the plane, an airport terminal, and a service vehicle. And each part of the set is quite detailed. The plane feature a galley and a toilet; the service vehicle has stairs, a baggage trailer, etc; and the terminal has revolving doors, security check, and a baggage conveyor belt. The building process is also well planned out and documented. The child is eased into building by starting out with the service vehicle, then comes the plane, and last the terminal, which can be challenging.
The remainder of the build is the control tower and terminal building. First there is a metal detector screener leading to the waiting/secure area of the airport, which seems taller than it needs to be for the minifigures. I think the same effect could have been made with half the height, except that would not allow for an impressive height for the overall tower. However it does seem to be similar to many modern airports with the high ceilings. This area also seems to be someplace to check luggage as evidenced by the rather nifty conveyor belt that comes in a full part. The moving parts of the set include a revolving door (a very tall one, for the first floor) that leads from the secure area of the airport out to the tarmac, and of course the conveyor belt.

Last to be assembled is the hangar, which given its size is a surprisingly quick build – even though I’m a notoriously slow builder it took me barely ten minutes to put it together. The first step involves stacking dark bluish grey and orange plates and tiles to create a three-sided enclosure covering an area of 24 x 32 studs. Two side walls are then constructed from 1 x 6 x 5 rectangular girders topped off with dark bluish grey bricks and orange tiles, after which the roof is assembled, predominantly from a few large plates including a black 8 x 16 plate only previously available in two sets, and four dark bluish grey 6 x 24 plates which are only appearing in a set for the second time ever. A couple of stickers at the front of the structure identify it as an Airshow Hanger; to be frank, describing it as a hanger is probably exaggerating the case a bit as with its open front and rear it’s more akin to a large shelter.

Parking capacity at Copenhagen Airport was greatly expanded in 2015 with the construction of a new lot as one of the first phases in an ambitious airport expansion plan scheduled to roll out in the coming decades. There are several lots: those near the terminals are very expensive, while the further-flung ones are cheaper (but have free shuttle bus service to the terminals).
×