My personal favourite of the three planes included in this set, the design is superb and really captures the look and feel of the old-fashioned airplane that it is based on. The build isn’t too complex, and it really is a joy to see the final product come together. The plane has a distinct orange colour scheme, with some black and grey thrown in, and the shades work well together.
I'm not sure what to make of the set yet. I like the planes (although that biplane really doesn't need the bubble canopy). The idea of adding a hangar is interesting and I don't mind that it's a bit open. But the fact that it'll only house one of the three planes is annoying. Having said that, I'm not sure what you could do about it. Tripling the hangar would make it big and boring and push the price up. Could they have done two planes and a double hangar?
It’s been three years since the release of the most recent City Airport set, namely, 60019 Stunt Plane, and a full six years since LEGO gave us a number of Airport releases at any one time. Of the five summer 2016 Airport releases, 60103 Airport Air Show was one of those that I was most interested to get my hands on, and I’m pleased to be able to bring you a review of it today.
LDStructure, developed by Michael Heidemann, is a tool for analyzing ldraw parts library. With LDStructure you will get a tool that tells you which parts are required to show the current part and where the current part is used in. You will get this information within a second or even quicker. So this tool is a "needs to have" if you are working on parts for the ldraw part library.

The programmable Lego brick which is at the heart of these robotics sets has undergone several updates and redesigns, with the latest being called the 'EV3' brick, being sold under the name of Lego Mindstorms EV3. The set includes sensors that detect touch, light, sound and ultrasonic waves, with several others being sold separately, including an RFID reader.[52]
From mid-2009, the airport was served by 9 airlines flying regular flight service, of which KLM had the busiest route with over 200,000 annual passengers to Amsterdam Schiphol. In 2011, Ryanair announced that Billund Airport with effect from 25 March 2012 would be the base for two Boeing 737 aircraft. At the same time Ryanair published 5 new routes, so that, from the summer of 2012, they would fly to 19 destinations.

In 1997 they had an architectural competition for a new 430,000 ft² (40,000 m²) passenger terminal, designed to serve 3.5 million passengers a year, north of the original airport. KHR Architects won the assignment and completed the construction in co-operation with COWI, and at the end of May 2002 the new passenger terminal was put to use, as the first phase of the future expansion, which is scheduled to take place north of the start and runway, while air cargo services, business and private aviation will continue to be served from the existing buildings south of the runway. In connection with this expansion, the largest since the beginning of the airport, it was with effect from 1 January 1997 turned into a Joint-stock company, Billund Airport A/S, with the former members Vejle County and municipalities Vejle, Kolding, Grindsted, Billund, and Give as shareholders.

Parking capacity at Copenhagen Airport was greatly expanded in 2015 with the construction of a new lot as one of the first phases in an ambitious airport expansion plan scheduled to roll out in the coming decades. There are several lots: those near the terminals are very expensive, while the further-flung ones are cheaper (but have free shuttle bus service to the terminals).
Parking capacity at Copenhagen Airport was greatly expanded in 2015 with the construction of a new lot as one of the first phases in an ambitious airport expansion plan scheduled to roll out in the coming decades. There are several lots: those near the terminals are very expensive, while the further-flung ones are cheaper (but have free shuttle bus service to the terminals).
×