Play out real-life scenarios in LEGO DUPLO Town: a recognizable world with modern DUPLO figures. Help your little pilot get ready for take-off at the LEGO DUPLO Airport! It's easy for preschoolers to build the boarding gate, luggage slide and revolving air traffic control tower. Makes an ideal gift for preschool children. Contains 29 pieces. Airport measures over 8 (22cm) high, 5 (14cm) wide and 4 (11cm) deep. Plane measures over 3 (9cm) high, 7 (18cm) long and 6 (17cm) wide.
The railway station, 1 Københavns Lufthavn, Kastrup Station (sometimes called CPH Airport Station and wrongly Kastrup Station), is located in Terminal 3. The station has frequent connections to Copenhagen and Malmö, as well as InterCity trains for the rest of Denmark and a few daily SJ 2000 express trains for Stockholm. The frequent Øresund trains between Copenhagen and Malmö continue in Denmark to Elsinore and in Sweden to a number of destinations in Scania and other parts of Götaland. The travel time to Copenhagen Central Station is 12 minutes, and 20 minutes to Malmö Central Station.

Since the 1950s, the Lego Group has released thousands of sets with a variety of themes, including space, robots, pirates, trains, Vikings, castle, dinosaurs, undersea exploration, and wild west. Some of the classic themes that continue to the present day include Lego City (a line of sets depicting city life introduced in 1973) and Lego Technic (a line aimed at emulating complex machinery, introduced in 1977).[47]
This detailed model features a classic red, black and grey colour scheme, large driver's cab with detailed dashboard, wing mirrors, opening tool storage compartment, 4-cylinder engine with moving pistons, twin-axle steering, double rear axle and chunky tires. Activate the boom to position the water cannon and extinguish the flames! This Power Functions upgradable model can be rebuilt to create an awesome Fire Rescue Vehicle!
The cockpit, including the stickers on the sides and the canopy, is identical to that of the first jet, as is the front of the aircraft. As previously noted, however, the wing configuration is different, as is the tail design which features twin tail fins and a pair of fuselage-mounted tailplanes. The red 4 x 1 x 3 tail fins, which have appeared in a total of seven sets including this one, are angled outwards similar to the arrangement on an F/A-18 Hornet. Overall, it’s another sleek design but once again the smooth lines are somewhat spoiled by the prominent canopy.
The middle section of the terminal (between the B and C gate areas) are dedicated to high-end fashion and accessories, among others you will find Gucci, Burberry and BOSS stores there. Other types of stores — many of which have two outlets, one east and one west of this section — include FineFood (domestic and international delicacies from fine cheese to foie gras and craft beer), WHSmith (books), Scandinavian Souvenirs (self-explanatory), and last but not least the five Heinemann Tax Free stores.
The set has an impressive assortment of minifigures - I quite like that it has six, allowing for a lot of play opportunities. All the major parts of the plane - the wing, cockpit, tail and body - are new to this set in their colours. The inside of the plane has a minimal amount of details, with five seats, a galley and a lavatory. The outside of the plane looks quite smart with all the stickers applied.
The airport handles an average of more than two million passengers a year, and millions of pounds of cargo. The airport's main runway can handle airliners as large as the Boeing 747, although most passengers arrive on smaller aeroplanes, such as ATR-42s, Boeing 737s and Boeing 757s. Boeing 747 activity at this airport is almost exclusively limited to cargo flights.

Correct me if I'm wrong, but is the hangar only large enough to house the biplane? A bit of a cock-up if that's the case. As good as the planes are, the hangar is a major failing. It looks like it's only about 30-40 pieces; just a bunch of big plates, some prefab cross-bracing and ... errrm ... air. Not so much a "hangar" as an aviation-equivalent of a car port!
Bag 7 finished off the front facade adds in a metal detector and the baggage check-in station.  I guess you enter from the right and then maybe the revolving doors are where you can walk out to the plane.  I'm not really sure anymore.  The conveyor belt is a nice addition to the set for playability and is set up so you can pull the baggage cart right next to it.  

The body of the plane is built with five seats for passengers. The wings are added next with what I think are filler stickers added to the top of the wings. There is a small galley with sink and oven in the front of the plane right behind the cockpit. The cockpit uses only one sticker to show navigation equipment - the other is printed, which is always welcome (though not a new piece). A lavatory is installed in the back, and then the inside is complete. There is an odd choice for the door to the lav - a swinging door. Not much opportunity for privacy!


Next we have the two Jet Pilots, one female and one male, both of which have identical torsos and helmets. The dark blue torsos, which are unique to this set, are printed with a nice design featuring a red jet with a red, white and gold jet wake plus gold jet insignia on the left breast. The white helmets incorporate a trans-black visor which can be raised and lowered; the helmets feature a print consisting of a star flanked with gold stripes, and like the torsos they’re currently exclusive to this set.


There are 3 cardboard boxes with more Easter eggs. We get a few references to Marvel organisations such as A.I.M., who you may remember from Iron Man 3 as an R&D agency run by Aldrich Killian, Hammer, one of Stark Industries primary rivals which made an appearance in Iron Man 2, bankrolling Whiplash and finally a box with the Stark Industries logo on it.
I did prefer the previous 3182 airport set as it had a lot more components. But, I realise that it makes more business sense to offer a little less than raise the price of an already expensive product. However, 60104 is still a nice set and is often very well discounted in the UK so, I ordered a pallet load from Tesco during their 3-for-2 which made them a half-priced no-brainer ;-)
There are 3 cardboard boxes with more Easter eggs. We get a few references to Marvel organisations such as A.I.M., who you may remember from Iron Man 3 as an R&D agency run by Aldrich Killian, Hammer, one of Stark Industries primary rivals which made an appearance in Iron Man 2, bankrolling Whiplash and finally a box with the Stark Industries logo on it.
It’s been three years since the release of the most recent City Airport set, namely, 60019 Stunt Plane, and a full six years since LEGO gave us a number of Airport releases at any one time. Of the five summer 2016 Airport releases, 60103 Airport Air Show was one of those that I was most interested to get my hands on, and I’m pleased to be able to bring you a review of it today.
In 2008, the entire runway was renovated and paved, and a new taxiway was built, nicknamed "Mike". This major task only took 14 hours. The runway was closed over night between the hours 23:00 and 06:00. This did not prevent a Boeing 737-800 from Ryanair landing at one end of the runway, while they worked at the other end. The same year was also a record year for the airport. 2,546,856 passengers passed through the terminals, an increase of 12.7 percent compared with 2007.
Inside the box we find eight numbered bags, two unnumbered bags containing large molded plane parts, two loose 16x16 plates, the large airplane wing in medium grey, a sticker sheet and four instruction booklets of varying sizes. Unfortunately there is no cardboard to keep the booklets and sticker sheet flat (though fortunately mine were not crumpled), but never fear, there is a brick separator!
Correct me if I'm wrong, but is the hangar only large enough to house the biplane? A bit of a cock-up if that's the case. As good as the planes are, the hangar is a major failing. It looks like it's only about 30-40 pieces; just a bunch of big plates, some prefab cross-bracing and ... errrm ... air. Not so much a "hangar" as an aviation-equivalent of a car port!

The programmable Lego brick which is at the heart of these robotics sets has undergone several updates and redesigns, with the latest being called the 'EV3' brick, being sold under the name of Lego Mindstorms EV3. The set includes sensors that detect touch, light, sound and ultrasonic waves, with several others being sold separately, including an RFID reader.[52]
The cockpit, including the stickers on the sides and the canopy, is identical to that of the first jet, as is the front of the aircraft. As previously noted, however, the wing configuration is different, as is the tail design which features twin tail fins and a pair of fuselage-mounted tailplanes. The red 4 x 1 x 3 tail fins, which have appeared in a total of seven sets including this one, are angled outwards similar to the arrangement on an F/A-18 Hornet. Overall, it’s another sleek design but once again the smooth lines are somewhat spoiled by the prominent canopy.
In 1997 they had an architectural competition for a new 430,000 ft² (40,000 m²) passenger terminal, designed to serve 3.5 million passengers a year, north of the original airport. KHR Architects won the assignment and completed the construction in co-operation with COWI, and at the end of May 2002 the new passenger terminal was put to use, as the first phase of the future expansion, which is scheduled to take place north of the start and runway, while air cargo services, business and private aviation will continue to be served from the existing buildings south of the runway. In connection with this expansion, the largest since the beginning of the airport, it was with effect from 1 January 1997 turned into a Joint-stock company, Billund Airport A/S, with the former members Vejle County and municipalities Vejle, Kolding, Grindsted, Billund, and Give as shareholders.

Correct - the hanger can only accommodate the biplane. That having been said, in order to accommodate the other aircraft too the hangar would have to be huge, with an enormous footprint, and a substantially increased parts count. As a result, I'd estimate a price up to double the current RRP which I suspect few of the target market would pay. LEGO therefore got the size of the hanger right IMHO.

This is a good set if you want an airport. The set includes a big plain and a terminal. The terminal has a control tower, check-in, luggage handler, fuel tank, ... I expanded my terminal and built it on a 32x32 baseplate and used the 2 grey 16x16 plates for the roof. The backside is not completely closed. Otherwise is the luggage belt is not accessible with my hand. I added 2 extra seats in the plane. Normally you have 6 seats in the plane, but I raised it to 8. I wanted more than 8 but that is almost not possible. The plane is brought with a big brick which includes the middle of the plane and the 2 wings and that one limits the possibilities. The toilet in the plane is still on the backside.
We are a collective bunch of geeks who love to share our passion with the rest of the world. Just like the Beholder we have adopted as our mascot, we have both depth and width of geeky topics we cover. By visiting this page, you declare yourself one of us! If you have grown up with a steady diet of all things related to video games, Star Wars, Star Trek, sci-fi, gadgets, toys, Transformers one way or another, this will be your second home.

The railway station, 1 Københavns Lufthavn, Kastrup Station (sometimes called CPH Airport Station and wrongly Kastrup Station), is located in Terminal 3. The station has frequent connections to Copenhagen and Malmö, as well as InterCity trains for the rest of Denmark and a few daily SJ 2000 express trains for Stockholm. The frequent Øresund trains between Copenhagen and Malmö continue in Denmark to Elsinore and in Sweden to a number of destinations in Scania and other parts of Götaland. The travel time to Copenhagen Central Station is 12 minutes, and 20 minutes to Malmö Central Station.


Compared to other major European hub airports, like Charles de Gaulle or Heathrow, CPH has a similar number of connections, but is much smaller in both actual size and passenger volumes, and can provide a calmer, more pleasant experience. Its location in the south of Scandinavia makes reaching most European destinations reasonable, and flying to destinations in the Baltic region and in Eastern Europe generally only takes half the time as from major hub airports in Western Europe.
Billund Airport had its beginning in 1961 when the son of the founder of the Lego Group, Godtfred Kirk Christiansen, established a private 800-meter long runway and hangar north of his factory in Billund. With Christiansen as a key driver, more of the neighbouring municipalities were included in the group of owners, and it was planned that the airport should be expanded to a regular public airport.
×