Pack your bags and get ready to go on vacation! Head to the airport and check in at the terminal. Put your luggage on the conveyor belt and watch it get loaded onto the passenger airplane. Go through security and then head out the revolving doors to the loading area. Climb the stairs and get buckled in, your trip is about to start! This creative play building toy includes 6 minifigures.

The capabilities of the Mindstorms range have now been harnessed for use in Iko Creative Prosthetic System, a prosthetic limbs system designed for children. Designs for these Lego prosthetics allow everything from mechanical diggers to laser-firing spaceships to be screwed on to the end of a child's limb. Iko is the work of the Chicago-based Colombian designer Carlos Arturo Torres, and is a modular system that allows children to customise their own prosthetics with the ease of clicking together plastic bricks. Designed with Lego's Future Lab, the Danish toy company's experimental research department, and Cirec, a Colombian foundation for physical rehabilitation, the modular prosthetic incorporates myoelectric sensors that register the activity of the muscle in the stump and send a signal to control movement in the attachment. A processing unit in the body of the prosthetic contains an engine compatible with Lego Mindstorms, the company's robotics line, which lets the wearer build an extensive range of customised, programmable limbs.[54][55]

LEGO City enables us all to remember why we fell in love with LEGO to begin with, to remember how we all first became exposed to LEGO; as a little kid, building our first house or giving our minifigures a hospital or a police station to work in. My first set was a garage, quickly followed by a police station. Having recently found these in storage, and keen to rebuild them, having the opportunity to build something not revolving around a Jedi or an Avenger is one I keen to take advantage of.
The final two minifigures are the Biplane Pilot and the intrepid Wing Walker. Both of these minifigures share the same white torso which is printed with a flight suit design overlaid with dark red and bright light orange flames plus a logo over the left breast. The torso design is superb and it can at present only be found in this set. Both minifigures are provided with a reddish brown aviator cap and dark bluish grey goggles, and the pilot (below left) also gets an alternative to this headgear in the form of medium dark flesh mid-length hair which has only ever appeared in five sets in this colour.
This is a good set if you want an airport. The set includes a big plain and a terminal. The terminal has a control tower, check-in, luggage handler, fuel tank, ... I expanded my terminal and built it on a 32x32 baseplate and used the 2 grey 16x16 plates for the roof. The backside is not completely closed. Otherwise is the luggage belt is not accessible with my hand. I added 2 extra seats in the plane. Normally you have 6 seats in the plane, but I raised it to 8. I wanted more than 8 but that is almost not possible. The plane is brought with a big brick which includes the middle of the plane and the 2 wings and that one limits the possibilities. The toilet in the plane is still on the backside.
There are 3 cardboard boxes with more Easter eggs. We get a few references to Marvel organisations such as A.I.M., who you may remember from Iron Man 3 as an R&D agency run by Aldrich Killian, Hammer, one of Stark Industries primary rivals which made an appearance in Iron Man 2, bankrolling Whiplash and finally a box with the Stark Industries logo on it.
The mechanic is a rather basic design, with an all-blue colour and a work shirt pattern. He comes equipped with a walkie-talkie and a full tool truck, containing every piece of equipment a mechanic could need. The airport worker looks like every other workman from The LEGO Movie that joined Emmet in a chorus of Everything is Awesome, and is a nostalgic hark bark to the old construction figures that I grew up playing with.
Parking capacity at Copenhagen Airport was greatly expanded in 2015 with the construction of a new lot as one of the first phases in an ambitious airport expansion plan scheduled to roll out in the coming decades. There are several lots: those near the terminals are very expensive, while the further-flung ones are cheaper (but have free shuttle bus service to the terminals).
×