Although no longer being published in the United States by Scholastic, books covering events in the Bionicle storyline are written by Greg Farshtey. They are still being published in Europe by AMEET. Bionicle comics, also written by Farshtey, are compiled into graphic novels and were released by Papercutz. This series ended in 2009, after nine years.[91]
This set is designed for children aged 6+, and one of the ways that it is suitable for them is the inclusion of separate instruction booklets and numbered bags for the different parts of the set (see my post about LEGO age range suitability here).  A younger modeller can build the plane or other item of their choice as soon as they open the box. It's not so much one big set as 5 different parts which make a whole scene. My 7 year old son chose to build a jet first of all...
In 2008, the entire runway was renovated and paved, and a new taxiway was built, nicknamed "Mike". This major task only took 14 hours. The runway was closed over night between the hours 23:00 and 06:00. This did not prevent a Boeing 737-800 from Ryanair landing at one end of the runway, while they worked at the other end. The same year was also a record year for the airport. 2,546,856 passengers passed through the terminals, an increase of 12.7 percent compared with 2007.
Colour-wise, it is mainly yellow, with only a dash of green and red, and a little more white, there to break it up. The worker has space to stand and drive the vehicle, and has a walkie talkie attached on the side of the car. Around the other side is a coiled-up, what I assume is a, fuel pump. It looks pretty good when coiled up on the side of the car. Stickers come into use again here, this time for the number plates.

The upper and lower wings are connected by a dark bluish grey 4 x 1 x 3 tail on either side; this tail element is unique to the set in this colour, although has previously appeared in a couple of sets back in 2003 in old dark grey. The upper wing is also supported by a couple of 1 x 2 x 2 black windows placed back to back in front of the cockpit, which from the perspective of the pilot really can’t be good for visibility. The biplane has a three blade propeller and the tips of the blades are stickered prior to sliding the propeller on to a 6L axle protruding from the front of the fuselage where it’s held in place by an orange 2 x 2 brick with domed top. The last step is to attach a 1 x 4 x 2 bar to the top of the upper wing for the Wing Walker to hold on to and then we’re done with the biplane.

I'm not sure what to make of the set yet. I like the planes (although that biplane really doesn't need the bubble canopy). The idea of adding a hangar is interesting and I don't mind that it's a bit open. But the fact that it'll only house one of the three planes is annoying. Having said that, I'm not sure what you could do about it. Tripling the hangar would make it big and boring and push the price up. Could they have done two planes and a double hangar?
Over the years, Lego has licensed themes from numerous cartoon and film franchises and even some from video games. These include Batman, Indiana Jones, Pirates of the Caribbean, Harry Potter, Star Wars, and Minecraft. Although some of the licensed themes, Lego Star Wars and Lego Indiana Jones, had highly successful sales, Lego has expressed a desire to rely more upon their own characters and classic themes, and less upon licensed themes related to movie releases.[48]
In 1997 they had an architectural competition for a new 430,000 ft² (40,000 m²) passenger terminal, designed to serve 3.5 million passengers a year, north of the original airport. KHR Architects won the assignment and completed the construction in co-operation with COWI, and at the end of May 2002 the new passenger terminal was put to use, as the first phase of the future expansion, which is scheduled to take place north of the start and runway, while air cargo services, business and private aviation will continue to be served from the existing buildings south of the runway. In connection with this expansion, the largest since the beginning of the airport, it was with effect from 1 January 1997 turned into a Joint-stock company, Billund Airport A/S, with the former members Vejle County and municipalities Vejle, Kolding, Grindsted, Billund, and Give as shareholders.
Parking capacity at Copenhagen Airport was greatly expanded in 2015 with the construction of a new lot as one of the first phases in an ambitious airport expansion plan scheduled to roll out in the coming decades. There are several lots: those near the terminals are very expensive, while the further-flung ones are cheaper (but have free shuttle bus service to the terminals).
×