This detailed model features a classic red, black and grey colour scheme, large driver's cab with detailed dashboard, wing mirrors, opening tool storage compartment, 4-cylinder engine with moving pistons, twin-axle steering, double rear axle and chunky tires. Activate the boom to position the water cannon and extinguish the flames! This Power Functions upgradable model can be rebuilt to create an awesome Fire Rescue Vehicle!


The middle section of the terminal (between the B and C gate areas) are dedicated to high-end fashion and accessories, among others you will find Gucci, Burberry and BOSS stores there. Other types of stores — many of which have two outlets, one east and one west of this section — include FineFood (domestic and international delicacies from fine cheese to foie gras and craft beer), WHSmith (books), Scandinavian Souvenirs (self-explanatory), and last but not least the five Heinemann Tax Free stores.
Help the pilot and the airport worker get the packages ready for delivery! Use the hand truck to load the packages on the airport service car and drive them to the back of the plane for loading. Fit all the packages in and then make sure the back is closed before letting the pilot know he's good to go. Take off for some fun package delivery in LEGO® City!
Billund Airport (Danish: Billund Lufthavn) (IATA: BLL, ICAO: EKBI) is an airport in Denmark. Located 1 nautical mile (1.9 km; 1.2 mi) northeast[1] of Billund, it serves as one of the country's busiest air cargo centres, as well as a charter airline destination, although some regular airlines also offer flights there. Nearby Legoland Billund park is the largest tourist attraction in Denmark outside Copenhagen.
In 2008, the entire runway was renovated and paved, and a new taxiway was built, nicknamed "Mike". This major task only took 14 hours. The runway was closed over night between the hours 23:00 and 06:00. This did not prevent a Boeing 737-800 from Ryanair landing at one end of the runway, while they worked at the other end. The same year was also a record year for the airport. 2,546,856 passengers passed through the terminals, an increase of 12.7 percent compared with 2007.

In contrast to the first jet with its delta wing configuration and forward canard wings, the second jet features a more conventional straight wing configuration with tapered leading and trailing edges. As you might expect, construction of the fuselage of the second jet is in many ways similar to that of the first, although in order to accommodate twin exhausts the rear isn’t tapered, and the air intakes which flank the fuselage are of a different design.
Parking capacity at Copenhagen Airport was greatly expanded in 2015 with the construction of a new lot as one of the first phases in an ambitious airport expansion plan scheduled to roll out in the coming decades. There are several lots: those near the terminals are very expensive, while the further-flung ones are cheaper (but have free shuttle bus service to the terminals).
×