Copenhagen Airport is a compact airport with two terminals for check-in, but with a common post-security departure and transfer area, thus making transfers very smooth. The airport handles in excess of 25 million passengers a year, which puts it in the same league as Zurich and Vienna. It has also consistently topped the charts for Nordic airports, serving as a European and intercontinental hub for all of them due to its location.
Attention then shifts to construction of the three aircraft. When I first spied this set I assumed that the two red jets were the same, but closer examination reveals a number of differences. First up is a red jet with a canard wing configuration as seen in the Saab Viggen amongst others. The lower fuselage is fashioned from a number of double and triple inverted 45 degree slopes with a pair of 1 x 14 Technic bricks running through the centre; there’s no obvious reason for Technic bricks to be used in this situation – standard 1 x 14 bricks would have done the job just as well - so I assume that LEGO just happened to have a bunch of them lying around…. A printed black 1 x 2 tile in the cockpit represents the instrument panel, while a substantial air intake is attached on either side of the fuselage at a 90 degree angle by way of brackets.
Bag 4 finishes the fuselage and all that is left are the engines and tail section.  You'll notice that this aircraft has a bathroom on board as well as some storage for a non-existent flight attendant.  I think this is the first time that LEGO has put some additional details into aircraft besides just seats.  Also there is only one pilot for a 2 seat cockpit in the set.  
In 2008, the entire runway was renovated and paved, and a new taxiway was built, nicknamed "Mike". This major task only took 14 hours. The runway was closed over night between the hours 23:00 and 06:00. This did not prevent a Boeing 737-800 from Ryanair landing at one end of the runway, while they worked at the other end. The same year was also a record year for the airport. 2,546,856 passengers passed through the terminals, an increase of 12.7 percent compared with 2007.
I cannot stress just how much I love this item, it may well be the highlight of the whole set. LEGO have released bi-planes before of similar design, but it still something to marvel over. Harking back to those older days of LEGO relying on imagination and not movie franchises, this is what we had to play with, and it is great to be able to relive that in today’s world.
In 2008, the entire runway was renovated and paved, and a new taxiway was built, nicknamed "Mike". This major task only took 14 hours. The runway was closed over night between the hours 23:00 and 06:00. This did not prevent a Boeing 737-800 from Ryanair landing at one end of the runway, while they worked at the other end. The same year was also a record year for the airport. 2,546,856 passengers passed through the terminals, an increase of 12.7 percent compared with 2007.
I'm not sure what to make of the set yet. I like the planes (although that biplane really doesn't need the bubble canopy). The idea of adding a hangar is interesting and I don't mind that it's a bit open. But the fact that it'll only house one of the three planes is annoying. Having said that, I'm not sure what you could do about it. Tripling the hangar would make it big and boring and push the price up. Could they have done two planes and a double hangar?
I did prefer the previous 3182 airport set as it had a lot more components. But, I realise that it makes more business sense to offer a little less than raise the price of an already expensive product. However, 60104 is still a nice set and is often very well discounted in the UK so, I ordered a pallet load from Tesco during their 3-for-2 which made them a half-priced no-brainer ;-)

Nice review, and it looks like a really nice set with a good mix of builds. The fact that I read the entire review without looking for the price speaks volumes for this in my opinion. The planes look good and I cannot see anyone from any age group who buys this not giving all three planes at least a quick test drive round the living room. One to add to my list.
The set contains six minifigures. Even though they all incorporate standard, unprinted minifigure legs together with commonly-available headprints, it appears that all six are unique to the set. First up are two members of the Ground Crew (below). The bearded guy has an orange torso printed with a hi-viz jacket, ID badge and red pen pattern. This has appeared in nine sets to date including all of the 2016 Airport sets plus 60080 Spaceport which I reviewed here last summer. His red construction helmet, which incorporates a pair of non-removable black ear muffs, has appeared in less than ten sets to date. The other member of the ground crew has a rather nice printed medium blue torso which is new this year and has only appeared in a total of three sets including this one. It features a shirt print which includes the Octan logo and a top pocket complete with a pen.
I'm not sure what to make of the set yet. I like the planes (although that biplane really doesn't need the bubble canopy). The idea of adding a hangar is interesting and I don't mind that it's a bit open. But the fact that it'll only house one of the three planes is annoying. Having said that, I'm not sure what you could do about it. Tripling the hangar would make it big and boring and push the price up. Could they have done two planes and a double hangar?
×