The construction of the new airport was carried out during 1964 and the airport opened on 1 November, with one runway at 1660 meters in length and 45 meters width, a small platform where aircraft could be served, and a control tower to the controller. Hans Erik Christensen, the former chief pilot at LEGO became director, and the passengers were handled in LEGO's hangar until the first terminal building was opened in the spring of 1966. The airport was continuously expanded the following years, with new facilities, terminal buildings, lounge, tax-free area and hangars where LC Johansen's studio often participated as an architect (today called the Johannsen Architects), while other work was carried out by the airport's own studio.
Colour-wise, it is mainly yellow, with only a dash of green and red, and a little more white, there to break it up. The worker has space to stand and drive the vehicle, and has a walkie talkie attached on the side of the car. Around the other side is a coiled-up, what I assume is a, fuel pump. It looks pretty good when coiled up on the side of the car. Stickers come into use again here, this time for the number plates.
×