The build itself is good fun, as it should be, and engaging enough to be interesting. The only thing that I started to find a little boring was the Airport Control Tower, but then its top redeemed it. Naturally, the best thing to build is the Giant Man figure. The techniques used to make it posable, like a regular Lego minifigure, were brilliantly thought out. I hope to see more like this, perhaps in a Galactus set, although I doubt that’ll ever happen.
Structurally, the plane model is sound and very well-built. A little too well-built in some areas you would say, but they are necessary measures like the awkward humps in the interior of the plane you will discover. Space is very wisely used in this model as they’ve managed to fit a proper looking cockpit for 2 pilots and even managed to squeeze in a sink, a mini-bar with the one drink, seats for 6 more passengers and even a tight little space of a washroom. That door hinge though, is a work of art.

Almost all major European carriers have a connection to Copenhagen from their main hubs. As Denmark holds sizable immigrant communities from various European countries, even smaller carriers have frequent connections to the likes of Sarajevo or Belgrade. Copenhagen Airport has been seeing increased traffic from low-fare carriers since the launch of the dedicated CPH Go section of the airport (with common check-in and security with other airlines, but separate gates and waiting area). Airlines using CPH Go include EasyJet, Ryanair, Transavia, and WizzAir, although the latter only for selected destinations, with the majority of its flights to the Øresund area landing at Malmö Sturup Airport instead.

In 1997 they had an architectural competition for a new 430,000 ft² (40,000 m²) passenger terminal, designed to serve 3.5 million passengers a year, north of the original airport. KHR Architects won the assignment and completed the construction in co-operation with COWI, and at the end of May 2002 the new passenger terminal was put to use, as the first phase of the future expansion, which is scheduled to take place north of the start and runway, while air cargo services, business and private aviation will continue to be served from the existing buildings south of the runway. In connection with this expansion, the largest since the beginning of the airport, it was with effect from 1 January 1997 turned into a Joint-stock company, Billund Airport A/S, with the former members Vejle County and municipalities Vejle, Kolding, Grindsted, Billund, and Give as shareholders.
Over the years, Lego has licensed themes from numerous cartoon and film franchises and even some from video games. These include Batman, Indiana Jones, Pirates of the Caribbean, Harry Potter, Star Wars, and Minecraft. Although some of the licensed themes, Lego Star Wars and Lego Indiana Jones, had highly successful sales, Lego has expressed a desire to rely more upon their own characters and classic themes, and less upon licensed themes related to movie releases.[48]
Anyway, I think this may be my favorite LEGO City air terminal yet! It may not be as big as some previous ones, but it feels really coherent. The plane is nice as well with its white, orange, and blue stripes. I agree that Heartlake City Airport's plane has a cozier and more detailed interior, though. It does really highlight some of the differences between Friends and City, with City opting for capacity over comfort and function over flair.
In 2008, the entire runway was renovated and paved, and a new taxiway was built, nicknamed "Mike". This major task only took 14 hours. The runway was closed over night between the hours 23:00 and 06:00. This did not prevent a Boeing 737-800 from Ryanair landing at one end of the runway, while they worked at the other end. The same year was also a record year for the airport. 2,546,856 passengers passed through the terminals, an increase of 12.7 percent compared with 2007.
This detailed model features a classic red, black and grey colour scheme, large driver's cab with detailed dashboard, wing mirrors, opening tool storage compartment, 4-cylinder engine with moving pistons, twin-axle steering, double rear axle and chunky tires. Activate the boom to position the water cannon and extinguish the flames! This Power Functions upgradable model can be rebuilt to create an awesome Fire Rescue Vehicle!
Billund Airport had its beginning in 1961 when the son of the founder of the Lego Group, Godtfred Kirk Christiansen, established a private 800-meter long runway and hangar north of his factory in Billund. With Christiansen as a key driver, more of the neighbouring municipalities were included in the group of owners, and it was planned that the airport should be expanded to a regular public airport.
Compared to other major European hub airports, like Charles de Gaulle or Heathrow, CPH has a similar number of connections, but is much smaller in both actual size and passenger volumes, and can provide a calmer, more pleasant experience. Its location in the south of Scandinavia makes reaching most European destinations reasonable, and flying to destinations in the Baltic region and in Eastern Europe generally only takes half the time as from major hub airports in Western Europe.
×