The airport handles an average of more than two million passengers a year, and millions of pounds of cargo. The airport's main runway can handle airliners as large as the Boeing 747, although most passengers arrive on smaller aeroplanes, such as ATR-42s, Boeing 737s and Boeing 757s. Boeing 747 activity at this airport is almost exclusively limited to cargo flights.

Parking capacity at Copenhagen Airport was greatly expanded in 2015 with the construction of a new lot as one of the first phases in an ambitious airport expansion plan scheduled to roll out in the coming decades. There are several lots: those near the terminals are very expensive, while the further-flung ones are cheaper (but have free shuttle bus service to the terminals).


A minifigure can comfortably fit seated inside the cockpit, and it is here that I found the first issue with the set. I had no issue inserting and removing the figure from his seated position, but my seven-year old struggled to get him out, deciding to leave him onboard instead of disembarking after she brought the jet back into the hangar. The physical connection between LEGO pieces in the cockpit and the pilot minifigure didn’t seem to present an issue, so whether or not this was just a one-off issue remains to be seen.
The road distance is to Billund 3 kilometres (2 mi), to Vejle 28 kilometres (17 mi), to Kolding 41 kilometres (25 mi), to Esbjerg 61 kilometres (38 mi) and to Aarhus 98 kilometres (61 mi). There are airport buses to Horsens, Skanderborg and Aarhus. Eight additional bus services operate from the airport. There are six parking zones named after countries of the world, USA, Australia, Kenya, Spain, Egypt and Greenland. Three of the zones are connected by a shuttle bus, the other three being within walking distance.
The railway station, 1 Københavns Lufthavn, Kastrup Station (sometimes called CPH Airport Station and wrongly Kastrup Station), is located in Terminal 3. The station has frequent connections to Copenhagen and Malmö, as well as InterCity trains for the rest of Denmark and a few daily SJ 2000 express trains for Stockholm. The frequent Øresund trains between Copenhagen and Malmö continue in Denmark to Elsinore and in Sweden to a number of destinations in Scania and other parts of Götaland. The travel time to Copenhagen Central Station is 12 minutes, and 20 minutes to Malmö Central Station.
Compared to other major European hub airports, like Charles de Gaulle or Heathrow, CPH has a similar number of connections, but is much smaller in both actual size and passenger volumes, and can provide a calmer, more pleasant experience. Its location in the south of Scandinavia makes reaching most European destinations reasonable, and flying to destinations in the Baltic region and in Eastern Europe generally only takes half the time as from major hub airports in Western Europe.
Compared to other major European hub airports, like Charles de Gaulle or Heathrow, CPH has a similar number of connections, but is much smaller in both actual size and passenger volumes, and can provide a calmer, more pleasant experience. Its location in the south of Scandinavia makes reaching most European destinations reasonable, and flying to destinations in the Baltic region and in Eastern Europe generally only takes half the time as from major hub airports in Western Europe.
If you’ve watched Captain America: Civil War, you’d know that the airport is the scene of one of the coolest superhero showdowns ever, with Team Iron Man and Team Captain America duking it out on the tarmac. The scene is chaotic, gorgeously choreographed and most importantly stolen by the likes of Spider-Man (not included in this set) and Ant-Man transforming into the aptly named Giant-Man.
Last to be assembled is the hangar, which given its size is a surprisingly quick build – even though I’m a notoriously slow builder it took me barely ten minutes to put it together. The first step involves stacking dark bluish grey and orange plates and tiles to create a three-sided enclosure covering an area of 24 x 32 studs. Two side walls are then constructed from 1 x 6 x 5 rectangular girders topped off with dark bluish grey bricks and orange tiles, after which the roof is assembled, predominantly from a few large plates including a black 8 x 16 plate only previously available in two sets, and four dark bluish grey 6 x 24 plates which are only appearing in a set for the second time ever. A couple of stickers at the front of the structure identify it as an Airshow Hanger; to be frank, describing it as a hanger is probably exaggerating the case a bit as with its open front and rear it’s more akin to a large shelter.

Since around 2000, the Lego Group has been promoting "Lego Serious Play", a form of business consultancy fostering creative thinking, in which team members build metaphors of their organizational identities and experiences using Lego bricks. Participants work through imaginary scenarios using visual three-dimensional Lego constructions, imaginatively exploring possibilities in a serious form of play.[73]
The main constituents of the set are a tanker truck, three aircraft and a hangar. Each of these gets its own instruction booklet and bags of elements. First up is the tanker truck (below) which at only four studs wide and less than ten studs in length reminds me of the 4-stud wide vehicles of my youth. This impression is reinforced by the inclusion of a couple of late 70’s-style 2 x 4 mudguards in the build.

The programmable Lego brick which is at the heart of these robotics sets has undergone several updates and redesigns, with the latest being called the 'EV3' brick, being sold under the name of Lego Mindstorms EV3. The set includes sensors that detect touch, light, sound and ultrasonic waves, with several others being sold separately, including an RFID reader.[52]
The railway station, 1 Københavns Lufthavn, Kastrup Station (sometimes called CPH Airport Station and wrongly Kastrup Station), is located in Terminal 3. The station has frequent connections to Copenhagen and Malmö, as well as InterCity trains for the rest of Denmark and a few daily SJ 2000 express trains for Stockholm. The frequent Øresund trains between Copenhagen and Malmö continue in Denmark to Elsinore and in Sweden to a number of destinations in Scania and other parts of Götaland. The travel time to Copenhagen Central Station is 12 minutes, and 20 minutes to Malmö Central Station.
Domain Administrator of LEGO Juris A/S failed to keep it trustworthy. Please be warned that to describe security status of Lego-airport.com we use data openly available on the Web, thus we cannot guarantee that no scam sites might have been mistakenly considered legit and no fraud or PC issues may occur in this regard. But usually the crowdsourced data we have is pretty accurate. Let's see it below.
The construction of the new airport was carried out during 1964 and the airport opened on 1 November, with one runway at 1660 meters in length and 45 meters width, a small platform where aircraft could be served, and a control tower to the controller. Hans Erik Christensen, the former chief pilot at LEGO became director, and the passengers were handled in LEGO's hangar until the first terminal building was opened in the spring of 1966. The airport was continuously expanded the following years, with new facilities, terminal buildings, lounge, tax-free area and hangars where LC Johansen's studio often participated as an architect (today called the Johannsen Architects), while other work was carried out by the airport's own studio.

This set has essentially all that's needed for airplane-related play: the plane, an airport terminal, and a service vehicle. And each part of the set is quite detailed. The plane feature a galley and a toilet; the service vehicle has stairs, a baggage trailer, etc; and the terminal has revolving doors, security check, and a baggage conveyor belt. The building process is also well planned out and documented. The child is eased into building by starting out with the service vehicle, then comes the plane, and last the terminal, which can be challenging.
The remainder of the build is the control tower and terminal building. First there is a metal detector screener leading to the waiting/secure area of the airport, which seems taller than it needs to be for the minifigures. I think the same effect could have been made with half the height, except that would not allow for an impressive height for the overall tower. However it does seem to be similar to many modern airports with the high ceilings. This area also seems to be someplace to check luggage as evidenced by the rather nifty conveyor belt that comes in a full part. The moving parts of the set include a revolving door (a very tall one, for the first floor) that leads from the secure area of the airport out to the tarmac, and of course the conveyor belt.
×